Wiki source code of Downtime
Version 6.1 by Андрей Калиновский on 2023/04/25 11:36
Show last authors
| author | version | line-number | content |
|---|---|---|---|
| 1 | //Detailed information about the AgroTechnology module is located in the " [[Instruction_on_the_AgroTechnology_module>>url:https://glonasssoft.ru/tmp/2022-01/%D0%98%D0%BD%D1%81%D1%82%D1%80%D1%83%D0%BA%D1%86%D0%B8%D1%8F_%D0%BF%D0%BE_%D0%BC%D0%BE%D0%B4%D0%BE%D0%BB%D1%8E_%D0%90%D0%B3%D1%80%D0%BE%D1%82%D0%B5%D1%85%D0%BD%D0%BE%D0%BB%D0%BE%D0%B3%D0%B8%D1%8F.pdf]] "// | ||
| 2 | |||
| 3 | The report displays information about downtime of objects that last more than 60 minutes. The report data is broken down by day (this is called a shift in report terms). Within a day, a list of stops is formed, which can be both inside geo objects and outside. | ||
| 4 | |||
| 5 | [[image:image-20230425113638-1.png]] | ||
| 6 | |||
| 7 | Report structure: | ||
| 8 | |||
| 9 | * Object name; | ||
| 10 | * Shift - a period equal to a day, during which equipment downtime was detected; | ||
| 11 | * Simple - the period of parking of equipment; | ||
| 12 | * Duration of downtime and location - one cell of the table indicates the duration of the parking of equipment and its location at the time of parking; | ||
| 13 | * Idle duration XX and location - indicates the duration of idling during parking, as well as the location of the object; | ||
| 14 | * Lane number - the number of the haul is increased after the geo object stops. |