Changes for page Downtime
Last modified by Андрей Калиновский on 2023/04/26 11:00
edited by Андрей Калиновский
on 2023/04/26 11:00
on 2023/04/26 11:00
edited by Андрей Калиновский
on 2022/09/09 13:49
on 2022/09/09 13:49
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
-
Attachments (0 modified, 0 added, 2 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 - Downtime1 +Простои - Content
-
... ... @@ -1,12 +2,2 @@ 1 -The report displays information about downtime of objects that last more than 60 minutes. The report data is broken down by day (this is called a shift in report terms). Within a day, a list of stops is formed, which can be both inside geo objects and outside. 2 2 3 -[[image:image-20230425113638-1.png]] 4 4 5 -Report structure: 6 - 7 -* Object name; 8 -* Shift - a period equal to a day, during which equipment downtime was detected; 9 -* Simple - the period of parking of equipment; 10 -* Duration of downtime and location - one cell of the table indicates the duration of the parking of equipment and its location at the time of parking; 11 -* Idle duration XX and location - indicates the duration of idling during parking, as well as the location of the object; 12 -* Lane number - the number of the haul is increased after the geo object stops.
- image-20230425113638-1.png
-
- Author
-
... ... @@ -1,1 +1,0 @@ 1 -XWiki.Gadmin - Size
-
... ... @@ -1,1 +1,0 @@ 1 -97.5 KB - Content
- Снимок экрана (402).png
-
- Author
-
... ... @@ -1,1 +1,0 @@ 1 -XWiki.Gadmin - Size
-
... ... @@ -1,1 +1,0 @@ 1 -85.9 KB - Content